Monday, February 23, 2009
One step forward, two steps back?
But the bottom line here is why is there such a rush to place these items on a May ballot? Why don’t some of the council members want to give the voters of our city an opportunity to understand the meaning and impact that each revision will have on our city? The consultant even stated that if single member districts passed it would not be until after the 2010 census that such an action could take place. So why not spend the time by taking each proposed amendment and setting a public meeting every month or so to allow the citizens an opportunity to ask questions and better understand what they will be voting on? Isn’t that what open and transparent government is all about? Why not record those meetings and play them back on channel 16 as well as placing them on the city web site? Why force the citizens to have to make a snap decision that will effect our city for a long time?
From emails I have received some believe that it is to distract the voters from learning about the new candidates that are running for office. Others believe that it is just the good old boys trying to shove something else down the throats of the citizens.
What are your thoughts?
Thursday, February 19, 2009
Upcoming NASA Rd. 1 Closure
CC: David Glasco, Manager Engineering & Construction
FROM: Shannon Hicks, Director of Public Works
DATE: February 18, 2009
SUBJECT: NASA Parkway Bridge Demolition
Texas Sterling, the general contractor for the current I-45 expansion project informed the City that starting Wednesday, March 4th, the NASA Parkway Bridge over I-45 will be closed. The contractor will begin milling up the asphalt on both approaches.
On Thursday, March 5th, the contractor will begin demolition of the bridge. Demolition is scheduled for March 5th through March 9th. The contractor stated that the interstate highway should be open by 5:00 AM on Monday, March 9th.
NASA Parkway will remain closed for up to 70 days (Approximate date of May 14th). Please note that the contractor has major incentives to complete this work early and will probably finish earlier than the May 14th date.
Alternate routes for the Webster area are:
FM 518
Bay Area Boulevard
El Dorado Boulevard
FM 2351 / Clear City Boulevard
The traveling public should expect major delays in the Webster area for the next 3 to 4 months.
Link to City of Webster info
Wednesday, February 18, 2009
Setting the record straight
Below is the Mayor's recap of the last council meeting.
Hello everyone,
I promised you my State of our Community Address, which I made to the League City Chamber of Commerce luncheon meeting this past Friday.
Thank you for inviting me to report the State of League City to you!
In the few months since becoming your Mayor, two major events have happened. Hurricane Ike slammed into the Texas coast and caused a lot of damage in League City and the communities around us. Our Emergency Management, Fire, Police, Public Works and the entire staff worked around the clock to get services back online, and they helped neighboring communities get their own services back up and running.
The 2009 Budget was reduced by 9.3 million dollars but not at the expense of good service to our residents. I requested freezing 13 positions in City government and Council agreed to all but two of those. The tax rate had to be increased, but only for capital improvement projects.
We are continuing with the improvements at the Dallas Salmon wastewater treatment facility, expanding our animal shelter, and helping residents dispose of materials like anti-freeze and used motor oil.
Our finance and accounting processes are receiving awards for excellence.
Then the national economy took one of the largest drops since World War II. This hit every business and citizen of League City! Fortunately League City's economy is better than most of America.
As we rebuild after two of the biggest storms in decades, we are moving ahead and growing as a city. Our police vehicles are becoming more fuel efficient. Some are hybrids, and others use only part of the motor when idling. All are more brightly lighted for safety.
We are working more closely with the Houston-Galveston Area Council. I have just been appointed to the Technical Advisory Committee at H-GAC. This will enhance our position for federal funds and at the perfect time, with the stimulus package being discussed in congress.
Last week I was in Washington and met with Senators Cornyn, Hutchison, and Congressmen Paul, Olson, Lee, and others. This trip was to make our presence known in the national Capitol. Senator Hutchison is especially interested in commuter rail and will help with legislation for 10 million dollars to fund the engineering phase which is the next step toward putting the rail line into operation.
Another transportation problem is the highway 518-270 area, sometimes called the '5-points nightmare.' We are working to design and build the best possible solution for this intersection. I wish it could be done quickly, but it takes time to correct a traffic problem that has been there for years and getting worse.
Next is the I-45/Hwy 518 intersection. When the Nasa Road Bypass is completed, we hope it will relieve some of our congestion! The Hwy 96/I-45 interchange and the widening of 646 will also help improve traffic, but we still need to work on improving the traffic flow through League City and onto I-45. Unfortunately when you correct a highway problem, it means construction and more traffic delays.
These connectors with I-45 are vital to League City and to Galveston County. We are the Gateway to Galveston County.
H-GAC and TxDot estimate that commuter rail between Houston and Galveston will be equal to one additional lane on interstate 45. We need to stop trying to pave over the entire country! Trees just don't grow well on asphalt!
Traffic delays are another reason I advocate more commercial business being encouraged to locate in League City. Then League City residents won't have to travel as far to work or shop and their sales tax dollars stay here!Residential growth is not good for League City if we must go outside the City to purchase what we need and take sales tax dollars to those other cities. We need more centers of commercial growth providing services for League City residents.
These are happening! Ask the Chamber of Commerce where these new developments are being built or look at the League City website or just drive around League City. The developments at 646 are still growing and this is especially good because one of our long-term problems has been the lack of sales tax income to offset property taxes. As we increase sales tax, the load is lightened on property tax.
UTMB is another tremendous asset to League City, and as much as it helps us to have them here, it also gives UTMB the protection they need from future hurricane damage.
Target, Walmart, Home Depot, HEB, Lowes and the restaurants and shops that make up the 646 intersection are all contributing to the positive growth of the city and the services that League City residents want. On the other side of the equation, League City residents are spending more of their disposable income here at home, not in other cities!
In addition to streets, we need to improve utilities. This is an expensive item-the wastewater system must be improved and water services need expanding. Our utilities were stretched before Hurricane Ike, and now with the additional residents moving here from the island and other storm impacted communities, these utilties are even more stressed.
While in Washington last week, this was one of my most important issues and with the economic stimulus package working it's way through Congress, timing was just right to put League City's needs before our national leaders.
It's NOT impossible to keep our streets in good repair and the utilities working while providing for new and expanding growth, but the businesses of League City require the constant attention of you, me, and all the citizens of our city.
We must all remember: we are "one of the best 100 cities in America" We have a rich historical heritage. We have some of the brightest children in Texas-and our schools are some of the best in America! We have parks, lakes, and creeks, and the beautiful oaks on Main Street. These trees will become the backdrop for a new downtown redevelopment district that is in its early stages.
Our library, parks, schools, and government are watched over by volunteers, employees, and elected officials, who help make us a city with open government, involved citizens, and natural assets unrivaled by any city in America.
Let me finish by saying "We have many opportunities for improvements, and many challenges. But we live and work in the largest city in Galveston County and one of the greatest cities in America, with more possibilities than problems.
League City will grow and prosper and all of us will make it happen!
Thank you.
Mayor Toni Randall
Wednesday, February 11, 2009
10th annual Clear Creek Clean up
Last year well over a thousand volunteers collected 12 tons of trash, 100 tires, 24 refrigerators, freezers and appliances. To view last year's video click here and follow the link marked "2008 clean up video"
To get the Clear Creek Environmental Foundation web site click here. To get a map and the schedule for the clean up (including preparation meetings and what to wear to be prepared) click here.
February 21, 2009 8:00 AM to 2 PM.FM 270 Boat Ramp
The FM 270 Boat Ramp is located under the Clear Creek Bridge on Hwy 270 between Nasa Parkway and Hwy 518.
Students may receive community service hours for their participation in all Clear Creek Environmental Foundation activities.
Shallow draft boat owners are invited to help ferry participants to locations on Clear Creek for trash collection.
On completion ot loading the dumpsters, volunteers will be treated to lunch.
Let us know if you plan on participating by emailing deb.3336@yahoo.com so we can make this a successful and rewarding experience for all.
Friday, February 6, 2009
True Leadership
Wednesday, February 4, 2009
Public Hearing: Township
Re: HDC-09-01 (21.5 acres, zoned RSF-7-RNC, Township, 600 N. Kansas Avenue, LC) -
Change acceptable elevations for conformity to section 56-4(8) of Historic District ordinance and Architectural guidelines.
Notice does not state if flood abatement, environmental impact or other concerns of any other jurisdictions apply. The HDC of the city will hold a public hearing "to provide all interested parties the right to appear and request information."
Does not state that these hearings have preset agendas that do NOT include recognizing persons on the floor who may wish to ask questions or submit concerns. Prepare to be muzzled. Notice was sent to property owners within 200 feet of the subject development.
Hearing date: February 19, 2009, 6PM, Council Chambers, 200 W.Walker, LC.
For more, contact P&Z at 281-554-1080 or Marck.Linenschmidt@LeagueCity.com; reference case no. HDC-09-01.
P. Moratto
Tuesday, February 3, 2009
Promises Kept
The Mayor's Report, January 27, 2009
I am delighted to report that my new HOA visitation program is proving to be a big hit. Last week we attended a meeting in Lakeside along with Phyllis Sanborn, Neal Baron, Jack Murphy and Tim Paulissen. Monday night we were invited to a large meeting in Clear Creek Village. We were represented by myself, Chris Reed, Mike Jez, Larry Herbert, Ken Clark, Phyllis Sanborn, and Tim Paulissen. We were glad to hear the citizens comments and are already working on their issues. If your HOA would like a visit by City officials, just call the Mayor's office.
January went out with a bang, for us in League City. Last night's Council meeting had a very diversified agenda, with some of the items simply not acted upon or voted down as not being pertinent. I will hit the highlights of the meeting for you.
The meeting opened with a FULL audience, which is great for us up on the dais to see! We really like it when so many chairs are filled! Councilmen Mike Barber and Chris Samuelson were absent.
Regarding proclamations, I was delighted to present a Certificate of Excellence to our staff who worked on Financial Reporting for the period ending September 30, 2007. We also heard an excellent presentation by Earth and Space Science Homeschoolers, called "Climate Connections: The Need for Green Roofs" urging the City to enact ordinances to guarantee that we all benefit from "going Green" by enacting green laws in League City.
Interestingly, and along this same "green" theme, Item 5.D. was a Public Hearing and Take Action to change.1 acres of Open Space in Cypress Bay to RSF-7 for homes. The vote was 4-1, with Paulissen being the negative vote.
Many of the folks in the audience were there for the agenda item 5.F which would move more lots at the Wharf into their PUD. The motion was made by Paulissen, seconded by Sanborn, and passed 5-0.
Renee Bennett told us about our proposed Boundless Special Needs Playground which was later in the agenda. Chien Wei explained to Council that, with their approval, we would be fundraising for the park and accepting donations made to Patrons of the Park, especially earmarked for this park. The equipment is proposed to be located just north of the Station Masters House in League Park, replacing equipment there that is scheduled for replacement anyway. Motion was made by Cones, seconded by Paulissen, passed 5-0.
We have now been re-branded with a new logo created by a 15-member Committee which considered all the possibilities for two months. Their goal was to keep our attachment to our beautiful oaks, and take us into the 21st Century at the same time. Members of the Committee were in the audience and a report was made by Ton Linklater and Peggy Zaylor. The cost to change everything on which the logo appears at the same time, for more impact, is $17,000. Council approved 5-0. So watch for the new look!
Our Director of Public Safety, Jamie Galloway, proposed Council consider a new Emergency Notification System. During Ike, we were offered to piggy-back on the County's notification system (which broke down). The proposed new system would preclude situations like that, and has the capability to send information by phone, text message, email, etc. It could be used for emergency information, plus any other special announcements that citizens need to know. Jamie proposed an 18-month contract, which would give us some cost savings by entering mid-year. Council passed 5-0
There was a great deal of discussion about how difficult it is to find a time that all of Council can meet for special workshops. Council did pass, 4-1 (Sanborn was against,) a first reading of an ordinance to establish a schedule of workshop meetings, which the City Attorney said are not mandatory and cannot be enforced.
There was also a long discussion about having a summer Council dress code, and after much back and forth, Nelson's motion was defeated 1-4.
An Executive session item had to do with clearing up the drainage problems in Lakeside, and Council voted to do whatever it takes to get this problem corrected as soon as possible. So, we're working on the problem, going out for bids, etc.
One of the items that was listed in Executive Session deserves my explanation to you as a citizen of League City. Councilmen Cones, Baron, and Nelson questioned Chris Reed, City Administrator, and HR Director Alison Smith for more than an hour about my hiring of Mr. Jerry Grooms back in December. When I took office, the office of Assistant to the Mayor was held by a very smart young woman, who though she is extremely alert and efficient, she does not have have experience along economic development lines. Because Chris Reed and I did not want to lose her, we found a good position for her in the City Secretary's office. Her duties were changed accordingly, plus being named Assistant to Chris Reed. Because I campaigned on economic development, I wanted to hire Mr. Jerry Grooms, who was at the time the EDC Director in LaMarque. I was delighted that he was interested in making the change (because he lives in League City,) because of his 25 years of municipal experience. With this arrangement, Mr. Grooms will be working not only with me, but also with Doug Frazier, which will keep the Mayor's office abreast of our economic development progress. Consequently, I met with Reed and Smith, so that all of the steps of this hiring would be strictly by the book. We three are satisfied with the way the hiring was handled.
Cones made a motion to cancel the position, with Nelson seconding. However, Mr. Baron said that while he shared the same feelings of Cones and Nelson, he was not going to vote for their motion because two wrongs don't make a right. Seeing that he did not have enough votes, Cones withdrew his motion, Nelson withdrew his second, and the issue died for lack of a motion.
For more than two hours, our paid staff and Council were kept on duty by this issue, the dress code discussion, and the workshop meetings first reading (which cannot be enforced.)
We are moving forward, folks, and things are looking good. I will be making my State of the Community speech in a couple of weeks, and will send it to you by email.
Mayor Toni Randall
One final thought by Mayor Randall
On Monday night P&Z passed an application for a Master Plan Revision to a Planned Unit Development by Tuscan Lakes. Their approval, required by the verbiage in the PUD Document, means that we will have almost 600 new apartments on both sides of 96 from Dickinson Avenue to SSH Blvd on the north, and 1266 on the south!!
The document said that refusal to pass the application would result in a lawsuit to the City, with the City paying all of the legal expenses. This document is similar to at least 20 others that were written and passed by Council during 2005-2006, and it is obvious that the fine print was not read thoroughly by the City.
You cannot blame the developer, as he is following his chosen profession as we all have a right to do to earn our living. He only did what he was allowed, but was paying more attention than the City was at the time.
But as a City, it is utterly incomprehensible that we who are supposed to be taking care of our citizens could have let this happen! I am simply astounded!
Our roads are beyond capacity, our infrastructure is straining at the seams, and we are all scrambling just to keep up, and here come another 600 units with their school age children, and several cars per household.
Under my leadership I will do everything in my power to be sure that all due diligence is done so that no such thing will happen in the future! The City Administrator and I will be working with the Director of Land Management to ensure that upcoming PUD and other development documents should not be allowed to contain this kind of verbiage.
Again, I am utterly astounded!
Sunday, February 1, 2009
Lone Star Flight Museum reopen now
Tuesday, January 27, 2009
Mayor Randall Leads by example
It’s refreshing to see an elected official do what they said they would do if elected. However not all elected officials do. This was a portion of Mr. Baron’s press release when he ran for office last year.
" “We must restore trust in our city government and change the direction of this city now” Baron said. “We need to make real ethics reform an immediate priority and we must stop allowing our elected officials to discuss and vote on projects that benefit their campaign contributors.” “We need to control residential growth and return fiscal responsibility to our city government now before it is too late.” “Big ticket spending items such as the proposed east side aquatic center and the numerous sewage treatment facility upgrades should be decided by the voters.” “I believe that I have the business experience and the ability to work professionally with others that we need to make League City the best city in Texas.” "
What a difference a year makes no ethics reform, a dog park for the chosen few, fighting the mayor on her appointments and showing little if any professional working relationship except with Tommy Cones and the good old boys. What a true disappointment.
The thoughts below were emailed to me and requested to be posted under a new thread. It outlines some of the reasons the citizens have lost faith in the judgment of Mr. Cones as well as Mr. Samulson.
Guardian of Taxpayers' Dollars ?
- Big league Dreams- the city does not collect tax dollars from this $22 million project billed to the city (Councilman Cones supported and voted for this project without voter input, as well as being invited to an all expense trip to California to tour their project.)
- Butler Long Horn Museum- costing the taxpayers nearly $1.8 million dollars; asking the city council for an additional $200,000. ; and still not open to the public after nearly 8 YEARS in the planning (Councilman Cones has consistently voted in favor of the project without voter input over the last 7 years)
- League City's Dog Park- a novel idea costing the city $379,000.00 but in the times of an Economic Recession very poor decision making on the council members voting in favor of this project. (Cones, Samuelson, Baron, Nelson) County Judge Yarbrough and Commissioners' Court favored the idea and were considering an area of Walter Hall Park to be used as a Dog park.
- Eastside Swimming pool and Senior Center- this "free project" will cost the taxpayers thousands of dollars in maintenance, personal, etc. The citizens of League City spoke very clearly when they voted down (by 3 to 1) the Natatorium/Senior Center. Why does council continue to approve money for this project without voter input? Cones leads the charge to continue the the east side swimming pool/ senior center without voter input.
Thursday, January 15, 2009
Blank Check Cones
While our mayor saved the taxpayer millions of dollars in the last budget cycle, (Mr. Cones was out of town during some of the Budget workshops) it appears that he and Mr. Baron will continue to find savings and spend it. At the last council meeting this became evident when Mr. Baron and Mr. Cones wanted to bring in a facilitator to “rush” the charter review recommendations to a vote for the May election. Why is it now being rushed to the voters? Is this another “Public emergency” like the trash contract Mr. Cones helped push thought the council? While Mr. Cones and Mr. Nelson both were on the council when the final report was presented (November 2007) neither one did ANYTHING to start the process until a year later, so why the rush now? It was asked during the council meeting by Mr. Cones or Mr. Nelson (it's the same voice) if the facilitator (who will write the language that will be used on the ballot) could be here on Monday (Jan. 19th) without regard to how much of our tax dollar will be spent. Just like the 377,000 dollar dog park that Mr. Baron and Mr. Cones supported, it appears that cost to the taxpayer is not a consideration.
Below is an exchange that shows the level of concern Mr. Cones has about the cost to the tax payers regarding the project.
-----Original Message-----
From: Csilla Ludanyi
To: Mayor&Council CC: Chris Reed; City Attorney; Barbara Long; Diana Stapp; Hazel Henry; Jeanne Hammack
Sent: Wed Jan 14 15:33:24 2009
Subject: Charter Review Workshop scheduling
Mayor and Council,
After receiving feedback from the attorney, Monty Akers, who will facilitate the Charter Review Workshop, it has been determined that this workshop will take about 4 hours. In the interest of getting this workshop scheduled as soon as possible, the following dates have been proposed:
Friday, February 6th from 1pm to 5pm
Saturday, February 7th from 8 am to 12 pm
Please email me and let me know if either or both of these times will work for you.Also, in order to best prepare the facilitator and organize this workshop, an agenda will be prepared. Please send me any requests you have for items of discussion regarding the charter review and proposed amendments.
Thanks,
Csilla Ludanyi
City of League City, Texas
Email: csilla.ludanyi@leaguecity.com
*******************************
Please note, per the Texas Public Information Act, Texas Government Code Chapter 552.002(b) most email correspondence pertaining to city business is subject to "open records requests" and is considered the property of the public.
The Mayor replies asking about the cost of this project.
From: Toni Randall
Sent: Wed 1/14/2009 4:18 PM
To: Csilla Ludanyi; Mayor&Council Cc: Chris Reed; City Attorney; Barbara Long; Diana Stapp; Hazel Henry; Jeanne Hammack
Subject: Re: Charter Review Workshop scheduling
Has anyone asked the cost of this project?
Toni Randall
Mayor
City of League City, Texas
************************************************************************
Please note, per the Texas Public Information Act, TexasGovernment Code Chapter 552.002(b) most email correspondencepertaining to city business is subject to "open records requests"and is considered the property of the public.
Mr. Cones replies
-----Original Message-----
From: Tommy Cones
To: Toni Randall; Chris Reed; Csilla Ludanyi; Mayor&Council
Sent: Wed Jan 14 17:07:30 2009
Subject:
RE: Charter Review Workshop scheduling
I'm sure the cost will be less than the investigation cost for the attorneys created by Cynthia and Travis.
And then the mayor replies.
-----Original Message-----
From: Toni Randall
To: Tommy Cones; Chris Reed; Csilla Ludanyi; Mayor&Council
Sent: Wed Jan 14 17:45:24 2009
Subject: Re: Charter Review Workshop scheduling
Or the lawsuits that you have caused
1 ameriwaste
2 glen cove
Oh that's right you have an EXCUSE You were not the only one voting.
Toni Randall
Mayor
City of League City, Texas
************************************************************************